Unidade de controle hidráulico (HCU) – RHD 4WD/RHD RWD
Hydraulic Control Unit (HCU) – RHD 4WD/RHD RWD

Texto da página
Link desta página: https://ranger.mbrace.com.br/oficina/209
Imagem: https://ranger.mbrace.com.br/img/oficina/209.webp
Anti-Lock Control
206-09A-7
206-09A-7
REMOVAL AND INSTALLATION
5.
CAUTION: Make sure that all openings
are sealed.
Torque: 18 Nm
E137388
6.
CAUTION: Make sure that all openings
are sealed.
Torque: 25 Nm
E137387
7. Torque: 9 Nm
x3
E130156
Installation
1. CAUTIONS:
If accidentally dropped or knocked
install a new hydraulic control unit
(HCU) and module assembly.
The blanking caps/plugs must not be
removed until the brake tubes are ready
to be connected.
To install, reverse the removal procedure.
2. Refer to: Brake System Bleeding (206-00 Brake
System - General Information, General
Procedures).
Refer to: Brake System Pressure Bleeding
(206-00 Brake System - General Information,
General Procedures).